ISO-690 (author-date, English)

ZHANG, Liang, LI, Shisheng, GENG, Zhichao, CHEN, Renxia und XU, Jiarui, 2026. Multiple parallel-batch machines scheduling with additive resource assignment and machine available times. Discrete Applied Mathematics. 30 Januar 2026. Vol. 379, , p. 675-684. DOI 10.1016/j.dam.2025.09.035.

Elsevier - Harvard (with titles)

Zhang, L., Li, S., Geng, Z., Chen, R., Xu, J., 2026. Multiple parallel-batch machines scheduling with additive resource assignment and machine available times. Discrete Applied Mathematics 379, 675-684. https://doi.org/10.1016/j.dam.2025.09.035

American Psychological Association 7th edition

Zhang, L., Li, S., Geng, Z., Chen, R., & Xu, J. (2026). Multiple parallel-batch machines scheduling with additive resource assignment and machine available times. Discrete Applied Mathematics, 379, 675-684. https://doi.org/10.1016/j.dam.2025.09.035

Springer - Basic (author-date)

Zhang L, Li S, Geng Z, Chen R, Xu J (2026) Multiple parallel-batch machines scheduling with additive resource assignment and machine available times.. Discrete Applied Mathematics 379:675-684. https://doi.org/10.1016/j.dam.2025.09.035

Juristische Zitierweise (Stüber) (Deutsch)

Zhang, Liang/ Li, Shisheng/ Geng, Zhichao/ Chen, Renxia/ Xu, Jiarui, Multiple parallel-batch machines scheduling with additive resource assignment and machine available times., Discrete Applied Mathematics 2026, 675-684.

Bitte prüfen Sie die Zitate auf Korrektheit, bevor Sie diese in Ihre Arbeit einfügen.